Further reading □ OverviewAccelerator at TRE (1947 to 1950)PLA: Installation in Building 412 (1956-1957)Me and my PLA Part IV (1957)Magnet Sector engineering at Metropolitan Vickers40 photographs of NimrodExcavation of Nimrod (1957)Construction of Nimrod (1959)Miscellaneous buildings (1958-1964)Building construction (1962-1963)Nimrod: Machine equipment (1960s)Nimrod: Various photographs (1960s)Nimrod: Construction and set up (1959-64)VEC, PLA and Nimrod (c.1963)Album No1: Early Nimrod experiments (1964-1966)Various accelerators (1950s-1960s)Miscellaneous building work (1962-1964)RHEL Senior Management, Open Day exhibits, Photos used on exhibits (1964)Nimrod inauguration (24th April 1964)Press Contact photos (April 1964)Nimrod Engineering Group: Magnet Album no.2 (1967)Displays for RHEL Open Days (July 1970) and Rutherford Centenary (October 1971)BC and PPT (1971)Rutherford Centenary (29th October 1971)Opening of the Library (26 November 1974)Loose photographs up to 1964Loose photographs from 1965 onwardsLoose colour photographsSlides
Contact us Heritage archives Image license terms

Search

    RUTHERFORD APPLETON LABORATORY
RALLiteraturePhoto albums
RUTHERFORD APPLETON LABORATORY
RALLiteraturePhoto albums
Further reading

OverviewAccelerator at TRE (1947 to 1950)PLA: Installation in Building 412 (1956-1957)Me and my PLA Part IV (1957)Magnet Sector engineering at Metropolitan Vickers40 photographs of NimrodExcavation of Nimrod (1957)Construction of Nimrod (1959)Miscellaneous buildings (1958-1964)Building construction (1962-1963)Nimrod: Machine equipment (1960s)Nimrod: Various photographs (1960s)Nimrod: Construction and set up (1959-64)VEC, PLA and Nimrod (c.1963)Album No1: Early Nimrod experiments (1964-1966)Various accelerators (1950s-1960s)Miscellaneous building work (1962-1964)RHEL Senior Management, Open Day exhibits, Photos used on exhibits (1964)Nimrod inauguration (24th April 1964)Press Contact photos (April 1964)Nimrod Engineering Group: Magnet Album no.2 (1967)Displays for RHEL Open Days (July 1970) and Rutherford Centenary (October 1971)BC and PPT (1971)Rutherford Centenary (29th October 1971)Opening of the Library (26 November 1974)Loose photographs up to 1964Loose photographs from 1965 onwardsLoose colour photographsSlides

Miscellaneous loose monochrome (black-and-white) photos up to 1964

Hand-written logs of photos were kept by the photographers but there are a number of issues: they did not always know exactly what they were photographing so some comments are very vague ("NIRNS progress" is a favourite); it is not always easy to read the handwriting; from 1965 rubber-stamped index numbers are of deteriorating clarity towards the end of each stamp's lifetime; some photo series numbers are duplicated; and some photos have been taken for use by individuals so are not documented at all which makes dating them inaccurate.

G4912 AWRE (sic) Harwell, 412 (Ministry of Works, 26 February 1954) G5019 AWRE (sic) Harwell, 412 (Ministry of Works, 25 March 1954) G5109 AWRE (sic) Harwell, 412 (Ministry of Works, 21 May 1954)

A3127 (2 January 1955) A3130 (12 January 1955) A3132 (12 January 1955) A3307 (13 April 1955) A3308 (13 April 1955) A3309 (13 April 1945; should be 1955) A3310 (13 April 1955) A3311 (13 April 1955) A3423 A3424 (25 May 1955) A3425 (25 May 1955) A3503 A3549 (13 July 1955) A3592 (12 August 1955) A3593 (12 August 1955) A3594 (12 August 1955) A3813 (29 September 1955)

A4165 (12 January 1956) A4381 (Spring 1956) A4392 Linear Accelerator cradle (19 April 1956) A4516 (16 May 1956) A4676 (26 July 1956)

A5312 Progress of B412 on PLA tank (3 May 1957) A5418 (June? 1957) A5531 Sir John Cockcroft digging first turf on site (13 August 1957) A5566 Close-up of excavation site progress from roof of B418 (21 August 1957) A5739 Progress work on Bevatron (27 September 1957) A5752 Progress work on Bevatron (27 September 1957) A7898 Close-up of DC gun, Nimrod Injector Room (29 September 1959) A5800 Progress on Bevatron (7 October 1957) A5881 Progress on Bevatron (14 November 1957) A5882 Progress on Bevatron (14 November 1957) A5883 Progress on Bevatron (14 November 1957)

A6582 (19 May 1958) A6625 Bevatron progress work (13 May 1958) A6781 Theoretical Physics Division (7 October 1958) A6952 Magnet sector delivery by Joseph Sankey and Sons (1958) A6953 Magnet sector delivery by Joseph Sankey and Sons (1958) A6954 First magnet for Bevatron arriving on site (27 November 1958) A7018 Bevatron progress work (10 June 1958)

A7155 Progress on 7 GeV synchrotron (1 January 1959) A7156 Progress on 7 GeV synchrotron (1 January 1959) A7156b Progress on 7 GeV synchrotron (1 January 1959) A7257 7 GeV progress (4 March 1959) A7260 7 GeV progress (4 March 1959) A7533 Nimrod injector/Experimental drift tube (29 May 1959) A7534 Nimrod injector/Drift adjusting (29 May 1959) A7598 Model of 7 GeV buildings (17 June 1959) A7599 Model of 7 GeV buildings (17 June 1959) A7673 Progress shots inside Nimrod: Magnet Room prior to machine construction (13 July 1959) A7674 Progress shots inside Nimrod (13 July 1959) A7675 Progress shots inside Nimrod; note the bicycle! (13 July 1959) AJ2828 General view of the 50 MeV Proton Linear Accelerator (PLA) with the vacuum and liner lid off Tank 3 showing the drift tubes (30 July 1959) A7791 7 GeV PS Magnet Model no.4. Sector test set ready to receive a sector (20 August 1959) A7892 EHT platform (29 September 1959) A7894 SAMES high voltage machine (29 September 1959) A7896 Condenser bank (29 September 1959) A7900 DC gun control panels (29 September 1959) A7904 Vacuum pump control console, front (29 September 1959) A7909 Model 5 Magnet 7 GeV: General view (30 September 1959) AJ2899 The London office of the United Kingdom Atomic Energy Authority, 11 Charles Street, London SW1 (19 October 1959) A8014 Machinery back target showing machine gap (5 November 1959) A8020 Plates stacked ready for annealing (5 November 1959) A8023 Sector leaving factory bay (5 November 1959) A8024 Sector leaving factory bay (5 November 1959) A8178 Nimrod magnet room: Early stages of magnet erection (30 November 1959) A8182 Nimrod magnet room ceiling (30 November 1959) A8183 Nimrod magnet room (30 November 1959) A8185 Nimrod magnet room (30 November 1959) A8186 Nimrod magnet room (30 November 1959) A8187 Nimrod magnet room (30 November 1959) A8188 Nimrod magnet room (30 November 1959) A8189 Nimrod magnet room (30 November 1959) A8191 Magnet Room (30 November 1959)

Arrival of the Pickfords transport with Injector Vessel for Nimrod showing unloading and sequence of events (9 December 1959)

A8208 A8210 A8211 A8212 A8213 A8214 A8216 A8219 A8220 A8223 A8224 A8227 A8228 A8230 A8213 A8232 A8233 A8234 A8235 A8236 A8237 A8238 A8239 A8240 A8241 A8242 A8243 A8244 A8245

TRE Staff (date probably 1950s) Back of photo

A8402 Interior of Experimental Area (12 January 1960) HL319 Nimrod magnet octant showing coil ends during installation (24 January 1960) A8505 End conductors general view with operators (9 February 1960) A8506 Nimrod Model VI: End conductors, plain end (9 February 1960) A8567 Jacking trolley position under shielding blocks (18 February 1960) A8683 (March 1960) A8823 Close-up of poles (29 March 1960) A8775 Nimrod Magnet Model VI: Close-up of coil connection (24 March 1960) A8817 Nimrod Magnet (March 1960?) A8821 Nimrod Magnet Model VI: General view (31 March 1960) A8822 Nimrod Magnet Model VI: CH of left-hand side (31 March 1960) A8823 Nimrod Magnet Model VI: CH of poles (31 March 1960) A8895 Transit case for magnet coils with top bracing removed (8 April 1960) A8896 Transit case for magnet coils with top bracing removed (8 April 1960) A8897 Transit case for magnet coils showing packing devices (8 April 1960) A8898 Transit case for magnet coils showing packing devices (8 April 1960) A8899 Magnetic coils in Dexion case storage (8 April 1960) A8900 Magnetic coils in Dexion case storage (8 April 1960) A9072 Intermediate sector positioning beam (May 1960) A9073 Intermediate sector positioning beam with reference plate and dial gauge jig (May 1960) A9074 Throat face levelling jib with levelling staff and levels (May 1960) A9075 Reflector jig (May 1960) A9218 Site picture of AERE taken from D?? showing Nimrod (30 May 1960) A9228 Fixture for accurate alignment of 20-ton magnet sector (31 May 1960) A9229 Fixture for accurate alignment of 20-ton magnet sector (31 May 1960) A9491 Progress in R3 showing concrete shuttering and sand boxes (13 July 1960) B6270 Intermediate target and spider supports; taken during fabrication of injector RF liner for Nimrod. Manufactured by London Aluminium Co. (18 July 1960) B6271 Linac vacuum vessel for Nimrod injector cover in position on milling machine at Babcock and Wilcox; photo taken 16 October 1959 (18 July 1960) B6272 Machining of alternator shaft for Nimrod power supply taken at works of manufacturer English Electric Ltd (18 July 1960) B6273 General picture showing alignment of RF liner for Nimrod injector. Manufactured by London Aluminium Co. (18 July 1960) B6274 Close-up of end coil arrangement of coils for Model VI. Photo taken at AEI works (18 July 1960) B6276 Copper bars for Nimrod main coils being loaded into annealing furnace after extrusion at James Booth Ltd (18 July 1960) B6277 AEI Manufacturer's photo: Girls taping the main magnet coils for Nimrod with vacuum oven in background (18 July 1960) EE06 English Electric Co. Ltd, Motor Alternator Foundation: Progress photo no.6 View showing sleeves to main HD bolts, prestressing ducts and reinforcement in west central section of block (7 September 1960) EE08 English Electric Co. Ltd, Motor Alternator Foundation: Progress photo no.8 View of top of west end of block proper (8 September 1960) A10185 Model VI Nimrod (18 November 1960) Q22569 (1960s)

A series of photos by JW Thomas, Headington.

24700 Nimrod Magnet Room: Central Pillar (1960s) 24703 Nimrod Magnet Room: Central Pillar (1960s) 24706 Shielding bridge of Nimrod (1960s) 24709 Nimrod: View of shielding bridge from Experimental Area. The steel pillar by the head of the middle man supports 7,000 tons of concrete (1960s) 24794 Nimrod Magnet Room: Central Pillar (1960s) 24795 Nimrod Magnet Room (1960s) 24796 Nimrod Magnet Room: Service Trench (1960s) 24799 Nimrod Magnet Room: Service Trench (1960s)

A series of photos by Fox Photos Ltd, Faringdon Road, London. (Pictures probably posed by model because he doesn't dare touch anything!)

702556 702558 Nimrod Motor Alternators 702559 702560 Nimrod Magnet Hall 702561 Central column, Nimrod Magnet Hall 702562 702563 Nimrod(?) Control Room 702564 702565 702566 Examining the model of site: What's inside Nimrod? 702567 Examining the model of site: What's inside Nimrod?

HL149 Lighting installations, Nimrod Magnet Hall (17 January 1961) HL317 Magnet Room showing central column (27 January 1961) HL318 Magnet Room Sectors (27 January 1961) HL321 Experimental Area showing concrete blocks (27 January 1961) AJ3361 The picture shows, from the left, the 600 kV electrostatic generator, storage capacitor and high voltage cubicle associated with the 600 keV ion gun which supplies pulses of protons to the 15 MeV linear accelerator injector for Nimrod (March 1961) AJ3362 The picture shows the 600 keV ion gun which supplies pulses of protons to the 15 MeV linear accelerator injector for Nimrod (March 1961) AJ3364 Installation of Nimrod magnet coils (March 1961) AJ3365 Work being carried out during the installation of the Nimrod magnet coils (March 1961) HL1467 Magnet coil installation (23 March 1961) HL1468 Experimental Hall windings before moving to transportation; coil side (23 March 1961) HL1469 Experimental Hall windings storage cases and transport cradle (23 March 1961) HL1470 Windings in case; transport cradle (23 March 1961) HL1473 Wood model frame (27 March 1961) HL1476 Nimrod vacuum system; testing a 50-foot section of the inner vacuum vessel prior to installation (27 March 1961) HL1479 NIRNS progress (27 March 1961) HL1950 Part of Nimrod Magnet Hall (11 April 1961) HL2450 Edwardson Construction: Build-up of 120 MW alternator set, Motor Alternator Room (4 May 1961) HL2623 Drift tube magnetometer experiment (9 May 1961) HL2627 Drift tube magnetometer experiment (9 May 1961) HL2716 RF Accelerator cavity (15 May 1961) HL2718 RF Accelerator cavity (15 May 1961) HL2725 Co-axial line components (15 May 1961) HL3066 ICI Terylene hose covers (6 June 1961) HL3070 Equipment in Nimrod (6 June 1961) HL3071 Equipment in Nimrod (6 June 1961) HL3072 Equipment in Nimrod (6 June 1961) HL3254 Clamping pole pieces with polepiece jack (June 1961) HL3255 Pole-piece jack in position (19 June 1961) HL3256 Installation of pole pieces (19 April 1961) Hall Engineering Ltd advert in Harlequin, April 1961 HL3640 National Hydrogen Bubble Chamber project, general view (14 July 1961) HL3641 National Hydrogen Bubble Chamber project general view (14 July 1961) HL3774 Quadrupole power points (24 July 1961) HL3997 Polarised Proton Source; mock-up of A10207 and A9947 (1 August 1961) HL3998 Diagram of Polarised Proton Source (PPS) (1 August 1961) HL4124 View of magnet throat prior to installation of pole pieces (10 August 1961) HL4126 View of magnet throat prior to installation of pole pieces (10 August 1961) HL4130 Locating a pole piece in magnet throat / Hilger-Watts Instruments (10 August 1961) HL4139 Pole piece installation / Hilger-Watts Instruments (10 August 1961) HL4122 Pole piece installation by Hilger and Watts Instruments (10 August 1961) HL4125 Pole piece installation by Hilger and Watts Instruments (10 August 1961) HL4127 Pole piece installation by Hilger and Watts Instruments (10 August 1961) HL4128 Pole piece installation by Hilger and Watts Instruments (10 August 1961) HL4131 Pole piece installation by Hilger and Watts Instruments (10 August 1961) HL4132 Pole piece installation by Hilger and Watts Instruments (10 August 1961) HL4133 Pole piece installation by Hilger and Watts Instruments (10 August 1961) HL4134 Pole piece installation by Hilger and Watts Instruments (10 August 1961) HL4135 Pole piece installation by Hilger and Watts Instruments (10 August 1961) HL4136 Pole piece installation by Hilger and Watts Instruments (10 August 1961) HL4137 Pole piece installation by Hilger and Watts Instruments (10 August 1961) HL4138 Pole piece installation by Hilger and Watts Instruments (10 August 1961) HL4140 Pole piece installation by Hilger and Watts Instruments (10 August 1961) HL4199 Magnetic field plots (15 August 1961) HL4207 Magnetic field plots (14 August 1961) HL4355 Neutron detection apparatus: Tank 1 Radiation Monitor, Buncher, Injector acceleration column (24 August 1961) HL4829 Close-up view of NIRNS (13 September 1961) HL4861 Polarised Proton Source (13 September 1961) HL4918 Building Research Station instruments in Magnet Room and Shield Bridge (21 September 1961) HL5447 Peeling test of lead film on aluminium plates (23 October 1961) HL5448 Peeling test of lead film on aluminium plates (23 October 1961) HL5449 Bend test on coated aluminium (23 October 1961) HL7431 NP apparatus (December 1961) HL7516 Vacuum vessel (outer) installed in Octant 4 (7 December 1961) HL7517 Vacuum vessel (outer) installed in Octant 4: Close-up (7 December 1961) HL7519 Straight 7 from inside (7 December 1961)

HL8256 RF valve cover for linac vessel (17 January 1962) HL8257 RF valve cover for linac vessel (17 January 1962) HL8258 RF valve cover for linac vessel (17 January 1962) HL8260 RF valve cover for linac vessel (17 January 1962) HL8261 RF valve cover for linac vessel (17 January 1962) HL8262 RF valve cover for linac vessel (17 January 1962) HL8263 RF valve cover for linac vessel (17 January 1962) HL8264 RF valve cover for linac vessel (17 January 1962) HL8265 RF valve cover for linac vessel (17 January 1962) HL8266 RF valve cover for linac vessel (17 January 1962) HL8446 Flat laminated RF valve cover for linac vessel (25 January 1962) HL8447 Flat laminated RF valve cover for linac vessel (25 January 1962) HL8448 Flat laminated RF valve cover for linac vessel (25 January 1962) HL8456 Progress in magnet room (25 January 1962) HL8458 Progress in Magnet Room (25 January 1962) HL8381 Control Room? (logs say Alternator Block progress) (23 January 1962) HL8382 Control Room? (logs say Alternator Block progress) (23 January 1962) HL8384 Alternator Block progress (23 January 1962) HL8385 Converter equipment (23 January 1962) HL8386 Converter equipment (23 January 1962) HL8432 Target chamber (24 January 1962) HL8456 Progress photos of magnet room (25 January 1962) HL8457 Progress photos of magnet room (25 January 1962) HL8510 PLA Feed Line (31 January 1962) AJ3723 The upper platform of the Bubble Chamber showing control equipment under construction (January 1962) HL8694 Air conditioning plant: Control dampers (8 February 1962) HL8867 Diagram: Cross-section of magnet (15 February 1962) A8630 Interior of vacuum vessel (26 February 1962) A8631 General view of steelwork in injector room (26 February 1962) A8632 General view of steelwork in injector room (26 February 1962) A8633 View of refrigerator plant under construction in injector room (26 February 1962) A8634 View of refrigerator plant under construction in injector room (26 February 1962) HL8657 Inner vacuum vessel faults: Accidents file (7 February 1962) HL8855 General view of National Hydrogen Bubble Chamber (15 February 1962) HL8857 General view of National Hydrogen Bubble Chamber (15 February 1962) HL9277 Landscaping of NIRNS spoil heap (9 March 1962) HL9278 Landscaping of NIRNS spoil heap (9 March 1962) HL9279 Landscaping of NIRNS spoil heap (9 March 1962) HL9280 Landscaping of NIRNS spoil heap (9 March 1962) HL9281 Landscaping of NIRNS spoil heap (9 March 1962) HL9755 Messrs Whartons Ltd, Maypole crane, Nimrod Magnet Hall (29 March 1962) HL9758 Linac vacuum and liquid air system (29 March 1962) HL9759 Linac vacuum and liquid air system (29 March 1962) HL9760 Linac vacuum and liquid air system (29 March 1962) HL9823 Photography in NIRNS for AEI (4 April 1962) HL9824 Photography in NIRNS for AEI (4 April 1962) HL9825 Photography in NIRNS for AEI (4 April 1962) HL10422 PLA Deuterium Thyratron (8 May 1962) HL10423 PLA Thyristor (8 May 1962) HL10424 PLA Thyristor (8 May 1962) HL10425 PLA Thyristor (8 May 1962) HL10426 PLA Thyristor (8 May 1962) HL10620 NIRNS progress (Beechams) (21 May 1962) HL10622 NIRNS progress (Beechams) (21 May 1962) HL11447 Nimrod machine (UKAEA Engineering Group Construction) (5 May 1962) HL11448 Nimrod machine (UKAEA Engineering Group Construction) (5 May 1962) HL10844 Earth mound from original mound (4 June 1962) HL10845 Earth mound from original mound (4 June 1962) HL10846 Earth mound from original mound (4 June 1962) HL10847 Earth mound from original mound (4 June 1962) HL10848 Earth mound from original mound (4 June 1962) HL11194 Apparatus in Control Room (20 June 1962) HL11195 Injector Room, R12 (20 June 1962) HL11441 Nimrod machine (5 July 1962) HL11443 Nimrod machine (5 July 1962) HL11448 Nimrod machine (5 July 1962) HL11449 Nimrod machine (5 July 1962) HL11724 End of sector eight magnet (18 July 1962) HL12188 ? (August 1962) HL12459 Vacuum vessel Octant 8 (30 May 1962) HL13015 Control Room R2 (2 October 1962) HL13738 Magnet Room R5 (October 1962) HL13751 General photography in Magnet Room R5 (1 November 1962) HL13752 General photography in Magnet Room R5 (1 November 1962) HL13753 General photography in Magnet Room R5 (1 November 1962) HL13754 General photography in Magnet Room R5 (1 November 1962) HL13755 General photography in Magnet Room R5 (1 November 1962) HL13920 Octant no.4 Magnet Room (12 November 1962) HL14093 R22 Restaurant construction (20 November 1962) HL14097 R5 Parasitic Area extension (20 November 1962) HL14393 General photography in Magnet Room (30 November 1962) HL14394 General photography in Magnet Room (30 November 1962)

HL16723 R18 Extension (28 February 1963) HL17292 Alternator block springs (21 March 1963) HL17293 Ultrasonic survey equipment (21 March 1963) HL18467 Nimrod Injector; Output beam line showing some of the high energy drift space components including the debuncher cavity (22 May 1963, NIRNS projects for Mr Mullett's visit to Russia) HL18468 Nimrod injector. General view with vacuum vessel cover in position, prior to commissioning of Nimrod (22 May 1963) HL18473 NIRNS projects for Mr Mullett's visit to Russia (22 May 1963) HL18477 NIRNS projects for Mr Mullett's visit to Russia (22 May 1963) HL18790 Nimrod control system (MCR and ICR) and temperature monitoring system (11 June 1963) HL19738 PLA installation drawing (July 1963) HL22588 Plant heat exchanger corrosion (29 November 1963) HL22589 Plant heat exchanger corrosion (29 November 1963) HL22590 Plant heat exchanger corrosion (29 November 1963) HL22591 Plant heat exchanger corrosion (29 November 1963) HL22593 Plant heat exchanger corrosion (29 November 1963) HL22594 Plant heat exchanger corrosion (29 November 1963) HL22950 Concrete monolith strain observations (16 December 1963) HL25084 HL25327

Beam characterisation signals. (Dates are those marked on trace.)

HL25541 7 GeV beam signal (23 March 1964) HL25542 First observed circulating 15 MeV beam (9 August 1963) HL25543 Circulating chopped 15 MeV beam (26 August 1963) HL25544 8 GeV beam signal (27 August 1963) HL25545 Circulating chopped 15 MeV beam (29 October 1963) HL25546 Circulating chopped 15 MeV beam (27 August? 1963) HL25571 Target spill on flat top. N beam inductive (3 April 1964) HL25572 Foil spill during acceleration (3 April 1964) HL25573 Foil spill during acceleration (3 April 1964) HL25615 Circulating chopped 15 MeV beam (13 March 1964) HL25616 Drive power: Reflectometer signal (6 April 1964) HL25617 Linac pulse signal: With stabilisation (6 April 1964) HL25618 Linac pulse signal: Stabilised (6 April 1964) HL25621 Phase oscillations shortly after RF capture (21 November 1963) HL25622 Radial motion of beam at synchrotron oscillation frequency (1 April 1964) HL25623 Typical radial motion of beam during acceleration (1 April 1964)

Progress at NIRNS (4 February/March 1964) AJ4130 50 MeV Proton Linear Accelerator: View of part of the Injector Room showing from left to right the EHT platform, the polarized proton source and DC gun and the 500 kV filter stack (April 1964) AJ4131 Nimrod Injector: View of the output end of the machine, showing the high energy drift space, beam chopper and debuncher cavity (April 1964) AJ4132 High-energy physics beam lines: View of the K2 and pi-1 beam lines leaving the Nimrod magnet ring before entering the second Experimental Hall (April 1964) AJ4133 Nimrod Injector: View of the P2 beamline emerging from Octant 3 of the Nimrod magnet ring (April 1964) AJ4136 50 MeV Proton Linear Accelerator: View of part of the Injector Room showing from left to right the 500 kV Cockcroft-Walton generator, the EHT platform, the Polarised Proton Source (PPS) and the DC gun (April 1964) AJ4137 Nimrod injector: Work on a probe box in the high energy drift space. The debuncher cavity can be seen in the centre background (April 1964) AJ4138 50 MeV Proton Linear Accelerator: Aligning the N 1/2 Spectrometer Magnet onto a beam line in the new Experimental Area (April 1964) AJ4139 50 MeV Proton Linear Accelerator: Setting up beam lines from the bending magnet in the new Experimental Area (April 1964) AJ4140 50 MeV Proton Linear Accelerator: New Experimental Area showing a beam line to an experimental set up by visiting university teams for the study of (p,2p) reactions (April 1964) AJ4141 High Energy Physics: The alignment of counters around a hydrogen target in the Nimrod Experimental Hall before the start of an experiment (April 1964) AJ4142 A counter and sonic spark chamber array being set up in the Nimrod Experimental Hall to record the position of a charged particle to within 1/100th inch. (April 1964) AJ4133 High Energy Physics beam lines: View of the P2 beam line emerging from Octant 3 of the Nimrod magnet ring (April 1964) HL25110 (1964) HL26736 Diagram: Nimrod beam diagnostic equipment (28 May 1964) HL26737 Diagram: Nimrod two-jaw box (28 May 1964) HL26738 Diagram: Nimrod pressure differential vacuum valve (28 May 1964) HL26739 Diagram: Nimrod Mk.1B Piccioni target mechanism (28 May 1964) HL26740 Diagram: Nimrod straight box No.1 inflector (28 May 1964) HL26741 Diagram: Nimrod beam detection grid (28 May 1964) HL26742 Diagram: Nimrod beam line outlet (28 May 1964) HLS26743 Datasheet: Nimrod vacuum chamber and beam intensity (28 May 1964) HL26744 Diagram: Nimrod beam aperture defining plates (28 May 1964) HL26745 Diagram: Nimrod radial and vertical beam electrodes (28 May 1964) SRC50 P3 Beam (28 July 1964) SRC51 P3 Beam (28 July 1964) SRC52 Pi3 Beam (28 July 1964) SRC53 Pi3 Beam (28 July 1964) SRC54 Pi3 Beam (28 July 1964) SRC55 P3 Beam (28 July 1964) SRC56 Pi2 Beam (29 July 1964) SRC57 Pi2 Beam (29 July 1964) SRC58 Pi2 Beam (29 July 1964) SRC59 Pi3 Igloo (29 July 1964) SRC60 Pi3 Igloo (29 July 1964) SRC61 Pi3 Igloo (29 July 1964) SRC62 Pi2 Igloo (29 July 1964) SRC63 Pi2 Igloo (29 July 1964) SRC64 Pi2 Igloo (29 July 1964) SRC70 Prototype auto film transport for scanning machines (11 August 1964) SRC71 Prototype auto film transport for scanning machines (11 August 1964) HL29323 PLA transmission cable/Type 2 pulse former output (9 October 1964) HL29634 Progress (27 October 1964) HL29638 Progress (27 October 1964) HL29639 Progress (27 October 1964) HL29640 Progress (27 October 1964) HL29641 Progress (27 October 1964) HL29642 Progress (27 October 1964) HL29643 Progress (27 October 1964) SRC130 Interior of igloo (23 December 1964) SRC134 Interior of igloo (23 December 1964) SRC136 Interior of igloo (23 December 1964) SRC137 Interior of igloo (23 December 1964) SRC138 Interior of igloo (23 December 1964) HL31379 Diagram of alignment of Nimrod and geological substrates (late 1964/early 1965) HL31872 Experimental apparatus for Nimrod (late 1964/early 1965) HL31873 Experimental apparatus for Nimrod (late 1964/early 1965) HL31874 Experimental apparatus for Nimrod (late 1964/early 1965) HL31875 Experimental apparatus for Nimrod (late 1964/early 1965) HL31876 Experimental apparatus for Nimrod (late 1964/early 1965) HL31877 Experimental apparatus for Nimrod (late 1964/early 1965) HL31878 Experimental apparatus for Nimrod (late 1964/early 1965) HL31879 Experimental apparatus for Nimrod (late 1964/early 1965)